Cable still needs to be buried.

Stcmf
Trailblazer lvl7

Need it buried so I can mow the grass. I keep having to move it around. My neighbor is having to do it too as it is on his property too. It’s been little over a month now. 

5 REPLIES 5

MediacomTom_
Moderator
Moderator

Hello Stcmf. This is typically completed within 30 days of the line being placed temporarily above ground pending weather and/or seasonal scheduling delays. Once those factors are clear they resume doing these work orders in the order they were received.

Was this a line installed to your home or your neighbors? Do you have the date your work order was completed or a more approximate date the line was placed on the ground by chance? 

If an order was not entered and completed following your temporary drop line being installed we would need the following details and can submit a request to have that bury work order placed for you:

Is the unburied line on the ground from Pedestal to another Pedestal: Yes/No

Or is the unburied line on the ground from the Pedestal to House: Yes/No

Is there a need for pre-bury work(this is used for road bores, etc.): Yes/No

Is the line crossing any sidewalks or driveways: Yes/No

Is the line going across neighboring or multiple properties: Yes/No

Describe location and whereabouts of line on property:  (For example; line goes from pole at corner of neighbors driveway and lays across neighbors fence into my left front yard across my yard to the left corner of my house)

 

RubyD1
Trailblazer lvl7

I also posted in this thread: https://community.mediacomcable.com/t5/account-help/cable-left-unburied-for-gt-6-months/m-p/3321#M29...

We also have 2 cables that have not been buried for 12 months between 1001 and 987 Dubs Dr, Iowa City, IA.  Both I at 987 and neighbor (985) and I called and opened multiple tickets but there has been no response.  Cables are hanging through the back porches and keep tripping over them and lawn service has to move the cables when they mow.  Can you please confirm tickets are open and provide a completion date? 

Is the unburied line on the ground from Pedestal to another Pedestal: No

Or is the unburied line on the ground from the Pedestal to House: Yes

Is there a need for pre-bury work(this is used for road bores, etc.): Yes/No

Is the line crossing any sidewalks or driveways: Yes - back porch

Is the line going across neighboring or multiple properties: Yes

Describe location and whereabouts of line on property:  (Starts between 1001 and 987 Dubs Dr, Circles behind 987 and 985 Dubs Dr and terminates at 985.

 

Hello @RubyD1. I am sorry for the amount of time that the temporary cable has been in place. A ticket has been submitted for the drop to be mapped and buried. I have requested a time frame for the work to be completed from the supervisor and will update you with any information I am provided. Thank you- Sean

Hi @MediacomSean - any update form the supervisor on when the work will be completed? 